Yes the smoke would have been a big problem on that job. The smoke generated on a hole that size would be immense. But I think the real problem would be getting the thick floor slab to drop straight down and not just wedge itself in. The thought of having to make a cut out that big, on an overhead section with a 5000lbs safe on it, just gives me the willies.